• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Otley

On average, our 1 Installers near Otley are rated: (4.47/5)
Order:

Solar Green Solutions - The UK's leading Solar Panel installer based in Yorkshire! We are a certified company ensuring quality and customer satisfaction.

location icon 32A Albion Street, Castleford, WF10 1EN

phone icon01977367537

On average, our 1 Installers near Otley are rated: (4.47/5)
Order:

location iconNearby we also have installers in Ilkley Shipley and Bingley

Latest Job requests posted in Leeds

08 Mar

Leeds (LS18)

New Solar PV Installation

Current Fuel Used: Gas. Current system: unsure. Age: Up to 5 yrs. Condition: Working. Work Timescale: ASAP (I may have no heating or hot water).

15 Nov

Wetherby (LS22)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: Open to advice. Work(...)

07 Nov

Ilkley (LS29)

New Solar PV Installation

Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

09 Aug

Ilkley (LS29)

New Solar PV Installation

Work Timescale: Within 3 Months.

16 Sep

Wetherby (LS22)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.(...)

15 Sep

Leeds (LS14)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: Yes - Other. Windows on roof: No. Work Timescale: Within 6 Months. Additional(...)

13 Aug

Leeds (LS10)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer. Work Timescale: Within 6(...)

11 Aug

Leeds (LS17)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

20 Jul

Pudsey (LS28)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 9 panels x 4. Work Timescale: ASAP.

14 Jul

Leeds (LS18)

New Solar PV Installation

Direction of roof: South West. Roof style: Flat. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.(...)

20 Apr

Leeds (LS17)

New Solar PV Installation

Roof direction: East/ West. Pitched and tiled. Tree in back garden and 1 roof light. Open to advice on the size of the system. Open to discussing a battery(...)

25 Mar

Leeds (LS12)

New Solar PV Installation

Supply and fit of Solar PV with battery. Roof faces , pitched and tiled. No shading, no windows in the roof. Timescale within 3 months. Contact anytime.

24 Mar

Wetherby (LS22)

New Solar PV Installation

Roof: SW facing. Pitched with tiled. No shading. No windows on the roof. Wants 16 panels. Install ASAP. Contact anytime.

03 Dec

Pudsey (LS28)

New Solar PV Installation

Roof facing: Different options. Pitched and tiled. Slight shading and 4 windows will be on roof. Open to advice on system size. Interested in batteries. Install(...)

21 Sep

Ilkley (LS29)

New Solar PV Installation

Roof: South facing. Pitched and tiled. No shading. 1 Dormer window. Open to advice on the size of the system needed. Would like a battery with the installation.(...)

11 May

Wetherby (LS22)

New Solar PV Installation

Existing abb aurora inverta has relay error (e031)and needs replacing, interested in price for Samsung ess, system is 10 Panels south and 6 panels west facing.(...)

20 Apr

Pudsey (LS28)

Repair/Maintenance of Solar PV System

I’ve a six plus year old Power one 3.6kw dual input inverter failed yesterday with “Int error E031”. Repair ASAP. Contact anytime.

12 Mar

Ilkley (LS29)

Repair/Maintenance of Solar PV System

The display on our generation meter isn’t working and we need it fixing.

13 Feb

Leeds (LS25)

New Solar PV Installation

East/south facing roof. Pitched. Tiled roof. No windows. No obstructions around. Open to suggestions on size of the system but wants large system. Install(...)

30 Dec

Wetherby (LS22)

New Solar PV Installation

Solar PV system required. Pitched and slate roof. No shading. 2 velux windows on the roof. Wants to discuss size of system required. Install within 1 month.(...)

27 Oct

Leeds (LS16)

Repair/Maintenance of Solar PV System

Maintaining solar panels 7/8 years old. Solar panels not working. Contact anytime.

01 Sep

Leeds (LS8)

New Solar Thermal Installation

Roof: south facing. Dorma Roof and Tiled. Open to suggestions on size. Install ASAP. Contact anytime.

02 Mar

Ilkley (LS29)

Repair/Maintenance of Solar PV System

Maintenance of solar pv.

17 Feb

Leeds (LS14)

New Solar PV Installation

3 bed mid terrace. Roof: south west. Pitched and tiled. No windows. No shading. Call anytime. Install within 3 months

05 Feb

Leeds (LS27)

New Solar PV Installation

South facing roof. Pitched. Tiled. No shading. No windows in roof. 3kw system. Fit within 6months. Contact any time.

20 Jan

Leeds (LS9)

New Solar Thermal Installation

We are looking at doing a seasonal heat store, using a larger than normal solar thermal array, and a normal sized hot water cylinder, with the waste heat going(...)

08 Nov

Tadcaster (LS24)

New Solar Thermal Installation

5-7 bed detached. Roof: garage roof. back is south. Pitched and tiled. No windows. No shading. Call anytime. Install within 1 year

18 Oct

Tadcaster (LS24)

New Solar PV Installation

Solar panels required to be fitted to an outbuilding as part of an extension/refurbishment. New to solar PV and incentives so any advice welcome. I can forward(...)

15 Mar

Leeds (LS17)

Repair/Maintenance of Solar PV System

There is currently no display on the meter. Repair: asap Contact: weekends

10 Mar

Leeds (LS14)

Repair/Maintenance of Solar HW System

Hi, we've had Navitron evacuated tubes fitted x 5 years. Connecting tube has worked loose at top of tubes, pressure down to just above 0. Company who fitted now(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue