• pen icon Complete our simple form
  • quote icon Up to 3 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Kenilworth

On average, our 4 Installers near Kenilworth are rated: (4.54/5)
Order:

Mypower design, supply and install solar photovoltaic (PV) systems which enable you to generate your own electricity and help your business to reduce its long(...)

location icon Quercus House, Orchard Industrial Estate, Toddington, Cheltenham, GL54 5EB

phone icon01242 620894

Oakapple Renewable Energy is part of The Oakapple Group; an established business founded in 1994 and based in Leeds, West Yorkshire. With over 20 years’(...)

location icon Oakapple House, 1 John Charles Way, Leeds, LS12 6QA

phone icon01132708052

Eco Greenenergy Solutions specialise in domestic and commercial installs, Solar PV, Solar Battery storage, Air source heat pumps, air to air and any other(...)

location icon Unit 30 Woodside Industrial Estate, Woodside, Thornwood, Epping, CM16 6LJ

phone icon08001114805

A company of accredited solar panel fitters, who are MCS registered.

location icon 1 Church Croft Gardens, Rugeley, WS15 2HT

phone icon07850336719

On average, our 4 Installers near Kenilworth are rated: (4.54/5)
Order:

location iconNearby we also have installers in Leamington Spa Warwick and Coventry

Latest Job requests posted in Coventry

24 Sep

Warwick (CV35)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 10kW. Work Timescale: Within 6 Months.(...)

23 Sep

Rugby (CV22)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice - wants to maximise space. Work(...)

21 Sep

Nuneaton (CV10)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4kwh or more. Work Timescale: Within 1 Month.

20 Sep

Nuneaton (CV11)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

30 Jul

Warwick (CV35)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Year.(...)

11 Jun

Coventry (CV3)

New Solar PV Installation

Solar PV. Roof: South West facing. Pitched and tiled. No real shading to affect panels. No windows on roof. Would be interest in discussing battery. ASAP.(...)

01 Jun

Stratford-upon-Avon (CV37)

New Solar PV Installation

Solar PV System. Roof: South facing. Pitched and slate. No shading to affect panels. No windows on roof. System size to be discussed with installer. Interested(...)

16 May

Southam (CV47)

New Solar PV Installation

Roof: South West Facing. Pitched and Tiled. No Shading. No Windows. Open to advice on System Size. Install within 3 months. Contact anytime.

12 May

Coventry (CV5)

New Solar PV Installation

Roof: South Facing. Pitched and Tiled. No Shading. No Windows. Open to advice on System Size. Install ASAP. Contact anytime.

06 May

Warwick (CV34)

New Solar PV Installation

Roof: south facing. Pitched and tiled. No shading. No windows on the roof. Install ASAP. Contact anytime.

31 Mar

Leamington Spa (CV32)

New Solar PV Installation

Roof facing: South East and South west. Pitched and tiled. No shading and no windows. Open to advice on system size. Install ASAP. Contact anytime.

09 Jan

Kenilworth (CV8)

New Solar PV Installation

Roof: South facing. Pitched and tiled. No shading. No windows on the roof. Install within 1 month. Contact anytime.

31 Dec

Coventry (CV3)

Repair/Maintenance of Solar PV System

Solar PV. Current PV system: 2kw. Current inverter: samil power. Panels wont work after wet weather and is coming up with an error code. Repair within 1 month.(...)

14 Oct

Nuneaton (CV10)

New Solar PV Installation

Roof facing: South. Pitched and tiled. No shading and no windows. Open to advice on system size. Install within 6 months. Contact anytime.

02 Oct

Shipston-on-Stour (CV36)

New Solar PV Installation

Roof facing: East West. Pitched and tiled. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation. Install:(...)

01 Sep

Warwick (CV35)

New Solar PV Installation

Detached house yet to be built. Roof: West facing. Pitched and slate. No shade. No windows on elevation where panels are planned. Would like to discuss size of(...)

20 Aug

Nuneaton (CV11)

New Solar PV Installation

Roof facing: South. Pitched and tiled. No shading and no windows. Open to advice on system size. Interested in battery. Install within 1 month. Contact anytime.

10 Aug

Rugby (CV21)

New Solar PV Installation

Roof facing: South. Pitched and tiled. No shading and no windows. Open to advice on system size. Interested in battery. Install within 6 months. Contact(...)

03 Aug

Stratford-upon-Avon (CV37)

New Solar PV Installation

Roof facing: West. Pitched and tiled. Slight shading and no windows. Open to advice on system size. Install ASAP. Contact anytime.

13 Jul

Stratford-upon-Avon (CV37)

New Solar PV Installation

Panels have to go on the ground, open to advice on which way they face. Open to advice on system size. Interested in battery. Install within 1 month. Contact(...)

24 Jun

Nuneaton (CV11)

New Solar PV Installation

Quote Type:solar panel system and battery, Work Type:new install. Roof faces East west, pitched and tiled. some trees potential shading, no windows in the roof.(...)

07 Mar

Atherstone (CV9)

New Solar PV Installation

Roof facing: South East. Pitched and tiled. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation. Install:(...)

27 Feb

Nuneaton (CV10)

New Solar PV Installation

Solar PV. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale asap. Contact anytime.

24 Jan

Coventry (CV6)

New Solar PV Installation

Roof facing: South. Pitched and unsure on roof material. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation.(...)

27 Nov

Nuneaton (CV10)

New Battery Installation (Solar PV)

Current PV system: 1.5kw. Current Inverter: unsure. Would like battery to go outside. Install within 6 months. Contact anytime.

02 Sep

Kenilworth (CV8)

New Battery Installation (Solar PV)

Battery required for solar PV. Size of system: 4kw. Inverter: Unsure of make/model. Locate battery in the garage. Timescale: within 1 month. Contact: anytime

21 Aug

Rugby (CV22)

New Solar PV Installation

Supply and fit of Solar with battery. Roof faces south ish, Pitched and tiled, no shading. 2 x velux windows in the roof. Timescale ASAP. Contact anytime.

15 Aug

Coventry (CV4)

New Solar PV Installation

Roof direction: West. pitched & tiled. No shading. No windows. Open to suggestions regarding system size and battery. Install: within 3 months. Contact:(...)

02 Aug

Stratford-upon-Avon (CV37)

New Battery Installation (Solar PV)

Current System: 8 panels Current Inverter: Unsure Location for Battery: Under the stairs. Install within 3 month. Contact evenings.

11 Feb

Nuneaton (CV11)

New Solar PV Installation

*Work from plans* Roof: South facing. Pitched and tiled. No shading. No windows. Open to advice on the size of the system needed. Would like to discuss a(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue

Great service,helpful advisor and very quick response to online enquiry.

Jan

quote bottom

Fast response and produced three local installers to provide competetive quotes. Makes finding potential reliable contractors so easy.

TonyP

quote bottom

Many thanks for helping to secure the refund of my depoosit from Halo Renewables who retained it for two weeks following the cancellation of my order in the cooling off period.

Bob Owen

quote bottom

What would you like to do now?

split shadow blue
Get Free Quotes Read More Reviews