• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Addlestone

On average, our 8 Installers near Addlestone are rated: (4.42/5)
Order:

Princeenergy (formerly Princesolar) is a trading division of Princebuild Limited, one of the Eastern Regions most trusted family Building Maintenance and(...)

location icon Empson Road, Peterborough, PE1 5UP

phone icon08456007800

Chelsfield Solar has been installing high-quality solar photovoltaic (PV) systems throughout the South East since 2002. Our highly experienced team provide a(...)

location icon Van Hage Garden Centre, Pepper Hill, Great Amwell, SG12 9RP

phone icon01442 211766

Eco Greenenergy Solutions specialise in domestic and commercial installs, Solar PV, Solar Battery storage, Air source heat pumps, air to air and any other(...)

location icon Unit 30 Woodside Industrial Estate, Woodside, Thornwood, Epping, CM16 6LJ

phone icon08001114805

JBR Electrical Contractors Ltd

location icon 74 Oldfield Road, Hampton, TW12 2HR

phone icon02080754675

ARK Charge specialise in the design, installation and maintenance of solar panels, battery systems and EV Chargers.

We have been delivering commercial and(...)

location icon Solent House Unit 17E, Lansbury Estate, Woking, GU21 2EP

phone icon01276300222

Save money on your energy bills and get between 12-20% returns under the latest FIT tariff.
We also install solar panels with EnPhase micro inverters,(...)

location icon C/O Big Yellow Storage Unit 1 Cobbett Park, 22 To 28 Moorfield Road, Slyfield Industrial Estate, Guildford, GU1 1RU

phone icon0800 888 6544

Windsor Solar specialises in the design, supply and installation of solar photovoltaic (solar P.V) systems . We also supply and install battery back up(...)

location icon 433, St. Leonards Road, Windsor, SL4 3DT

phone icon01753 831961

Solid Electrical has over a decade of experience of installation and maintenance of solar PV systems.

location icon 123 Capital Business Centre, Calrton Road, South Croydon, CR2 0BS

phone icon08000614600

On average, our 8 Installers near Addlestone are rated: (4.42/5)
Order:

location iconNearby we also have installers in Chertsey Weybridge and West Byfleet

Latest Job requests posted in Kingston upon Thames

22 Jun

Walton-on-Thames (KT12)

New Solar PV Installation - Online Quote

Work Timescale: Within 6 Months. Property Ownership: Property Owner. Direction of roof: South East. Roof style: Unsure. Material: Unsure. Shading: None.

28 Feb

New Malden (KT3)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Flat. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months. Additional(...)

21 Feb

West Byfleet (KT14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale: ASAP.

17 Feb

Worcester Park (KT4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

16 Jan

Leatherhead (KT22)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

15 Nov

Tadworth (KT20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Metal. Shading: None. System size required: 12 x panels. Work Timescale: Within 3 Months.(...)

10 Nov

Tadworth (KT20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Metal. Shading: None. System size required: 12 x panels. Work Timescale: Within 3 Months.(...)

27 Oct

Addlestone (KT15)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: advice needed. Work Timescale: ASAP. Additional notes: new(...)

13 Sep

Kingston upon Thames (KT2)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 3(...)

10 Sep

Kingston upon Thames (KT1)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: Open to advice. Work Timescale:(...)

09 Sep

Kingston upon Thames (KT2)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: Within 3 Months.

08 Sep

Surbiton (KT6)

New Solar PV Installation

Direction of roof *South East Roof style *Pitched/Angle Roof material *Other Shading * Yes - Nearby tree Any windows on roof? *No System size required? Open to(...)

07 Sep

New Malden (KT3)

New Solar PV Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

16 Aug

Kingston upon Thames (KT1)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Flat. Material: Other. Shading: None. System size required: open to advice. Work Timescale: ASAP. Additional notes:(...)

08 Aug

East Molesey (KT8)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Over 16 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: Before 1900. Insulation: Loft(...)

24 Jul

Leatherhead (KT22)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Year. Additional notes:(...)

20 Jul

Cobham (KT11)

New Battery Installation (Solar PV)

Current system size: not got one. Current inverter: not got one. Battery location: cupboard. Work Timescale: ASAP.

15 Jul

Kingston upon Thames (KT2)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: Before 1900. Insulation: Loft & Cavity wall. Windows: Double glazing. Work(...)

15 Jul

Worcester Park (KT4)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

24 May

Weybridge (KT13)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.

06 May

Leatherhead (KT23)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Unsure. Shading: None. Work Timescale: ASAP. Additional notes: GM.

15 Mar

New Malden (KT3)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: ASAP.

14 Feb

Addlestone (KT15)

Repair/Maintenance of Solar PV System

Current system size: 8 panels 1.9. Work Timescale: ASAP. Additional notes: 1 panel not working properly.

08 Nov

New Malden (KT3)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Other. Shading: None. System size required: open to advice. Work Timescale: ASAP.

23 Oct

Walton-on-Thames (KT12)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

23 Oct

Walton-on-Thames (KT12)

New Solar PV Installation

Not entirely sure about the gas boiler issue. We currently have what we THINK is a "combi".

19 Oct

New Malden (KT3)

New Battery Installation (Solar PV)

Current system size: 19 kw. Work Timescale: ASAP.

23 Aug

Tadworth (KT20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: Discuss with installer. Work(...)

23 Aug

Tadworth (KT20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: Discuss with installer. Work(...)

12 Aug

Surbiton (KT6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 19 panels approx.. Work Timescale: Within 6 Months.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue