• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Shanklin

On average, our 1 Installers near Shanklin are rated: (4.55/5)
Order:

Eco Greenenergy Solutions specialise in domestic and commercial installs, Solar PV, Solar Battery storage, Air source heat pumps, air to air and any other(...)

location icon Unit 30 Woodside Industrial Estate, Woodside, Thornwood, Epping, CM16 6LJ

phone icon08001114805

On average, our 1 Installers near Shanklin are rated: (4.55/5)
Order:

location iconNearby we also have installers in Sandown Ventnor and Bembridge

Latest Job requests posted in Portsmouth

18 Apr

Newport (PO30)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Shading: Yes - Nearby tree. System size required: advice needed. Work Timescale: Within(...)

17 Apr

East Cowes (PO32)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: Within 6(...)

19 Nov

Ryde (PO33)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 3.6kw approx. Work Timescale: ASAP. Additional(...)

03 Nov

Portsmouth (PO6)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 10kw battery, 3-4kw panels. Work Timescale: Within(...)

21 Oct

Waterlooville (PO8)

New Battery Installation (Solar PV)

Current system size: 3kw. Current inverter: Unsure. Battery location: Garage. Work Timescale: ASAP. Additional notes: Has 12 individual inverters on panels.

03 Aug

Bognor Regis (PO21)

New Battery Installation (Solar PV)

Current system size: 3.75kW. Current inverter: Solar edge. Battery location: Garage. Work Timescale: Within 1 Month.

20 Jun

Portsmouth (PO6)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

17 Jun

East Cowes (PO32)

New Solar PV Installation

Current Fuel Used: Gas. Current system: baxi. Age: Over 16 yrs. Condition: Working. Location: backroom - relocate to kitchen. Flue location: Roof. Work(...)

01 Jun

Bognor Regis (PO21)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Up to 5 yrs. Number of Bedrooms: 5. Number of rooms: 11-15. Property Age:(...)

03 May

Havant (PO9)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Electric. Age: Unsure. Number of Bedrooms: 3. Number of rooms: 6-10. Property Age:(...)

14 Apr

Cowes (PO31)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

08 Mar

Portsmouth (PO1)

New Battery Installation (Solar PV)

Current system size: 2.72kw. Current inverter: Unsure. Battery location: Open to suggestion. Work Timescale: Within 1 Month.

23 Jan

Gosport (PO13)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

17 Jan

Fareham (PO16)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 1(...)

18 Nov

Bembridge (PO35)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

30 Oct

Yarmouth (PO41)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: 4kw+ system. Work Timescale: ASAP.(...)

08 Oct

Chichester (PO19)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Advice from installer. Work Timescale:(...)

01 Sep

East Cowes (PO32)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.(...)

09 Aug

Portsmouth (PO6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

06 Aug

Chichester (PO18)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale:(...)

21 Jul

Shanklin (PO37)

New Solar PV Installation

Direction of roof: South East. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.(...)

20 Jul

Bognor Regis (PO22)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Open to suggestions. Work Timescale:(...)

17 Jul

Southsea (PO4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

16 Jul

Hayling Island (PO11)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

29 Jun

Chichester (PO19)

Repair/Maintenance of Solar PV System

Current system size: unsure. Work Timescale: ASAP.

16 Jun

Hayling Island (PO11)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: unsure. Work Timescale: ASAP.

10 May

Hayling Island (PO11)

New Solar PV Installation

Flat roof although there are a couple of smaller pitched roofs. No shade. No windows on roof. Would like to discuss size of system required. Install within 3(...)

08 May

Ventnor (PO38)

New Solar PV Installation

Roof facing: South. Roof: Pitched. Tiled. No shading that should affect panels. There is a window in the roof. System size 6 and above with battery. Install(...)

30 Apr

Waterlooville (PO8)

New Solar PV Installation

Roof direction: South-West Facing. Pitched and tiled. Some trees which shade in the morning and no windows. Open to advice about the size of the system. Open(...)

21 Apr

East Cowes (PO32)

New Battery Installation (Solar PV)

Supply and fit of a battery. Solar PV system is 5 years old. 3kW. Install: ASAP. Contact: anytime.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue