• pen icon Complete our simple form
  • quote icon Up to 3 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Barnet

On average, our 3 Installers near Barnet are rated: (4.61/5)
Order:

M Y Group is a Southern based heating and electrical contractor, offering a full in house one stop shop for renewables, and associated works, using our own(...)

location icon Fen Lane Farm, Watton Road, Norwich, NR16 2AJ

phone icon01953 497177

Our installations teams always include experienced roofers and electricians that have managed and worked on large electrical installations. We design efficient(...)

location icon 2 Depot Cottage, Beare Green, Dorking, RH5 4QR

phone icon01206 899 118

We have completed over 5000 installations all over the UK, making our customers huge savings on their energy bills with the latest renewable energy technology. (...)

location icon The Courtyard, 103-105 High Road, Benfleet, SS7 5LN

phone icon08001930944

On average, our 3 Installers near Barnet are rated: (4.61/5)
Order:

location iconNearby we also have installers in Potters Bar Borehamwood and Edgware

Latest Job requests posted in the United Kingdom

16 May

London (W7)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 6 Months.

16 May

Reading (RG30)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

16 May

Trimdon Station (TS29)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 6.5kw. Work Timescale: ASAP.

13 May

Rotherham (S61)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: ASAP.

13 May

Bishop Auckland (DL13)

New Solar Thermal Installation

Direction of roof: South East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

12 May

Hope Valley (S32)

New Battery Installation (Solar PV)

Current system size: not got one yet. Current inverter: not got one yet. Battery location: open to advice. Work Timescale: Within 3 Months. Additional notes:(...)

12 May

Bromley (BR1)

New Battery Installation (Solar PV)

Current system size: not got one. Current inverter: not got one. Battery location: open to advice. Work Timescale: Within 6 Months.

12 May

Bromley (BR1)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Electric. Age: Unsure. Number of Bedrooms: 5+. Number of rooms: 6-10. Property Age: After 1980. Insulation: Loft(...)

12 May

Caldicot (NP26)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice/4.5kw approx. Work Timescale:(...)

12 May

Pitlochry (PH16)

New Solar Thermal Installation

Work Timescale: ASAP.

12 May

London (W12)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Unsure. Roof style: Flat. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months.

12 May

Peterborough (PE7)

New Solar PV Installation

Current Fuel Used: Gas. Current system: Ideal Classic. Age: Over 16 yrs. Condition: Working. Location: Utility room. Work Timescale: Within 3 Months.

12 May

London (E10)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 2.5KWATT. Work Timescale: ASAP.

12 May

Willenhall (WV13)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to Advice. Work Timescale: Within 3 Months.(...)

11 May

Birmingham (B13)

New Solar PV Installation

Current Fuel Used: Gas. Current system: Nothing currently there. Age: Up to 5 yrs. Condition: Not working. Location: nothing currently there. Flue location:(...)

10 May

London (SW6)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Up to 5 yrs. Number of Bedrooms: 3. Number of rooms: 6-10. Property Age: After 1980. Insulation: Loft(...)

10 May

Truro (TR3)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Oil. Age: Over 16 yrs. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation:(...)

10 May

Milltimber (AB13)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

09 May

Wadhurst (TN5)

Repair/Maintenance of Solar HW System

Current system size: 4kWh (17 panels). Work Timescale: Within 1 Month.

09 May

London (W3)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: OTA. Work Timescale: Within 1 Month. Additional(...)

09 May

Liverpool (L17)

New Solar PV Installation

Roof : South, pitched and tiled. No shading, no windows. Timescale : within 1 year.

08 May

Blackburn (BB1)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

07 May

Cambridge (CB5)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

06 May

Hessle (HU13)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: discuss installer-. Work Timescale: Within 6 Months.

06 May

Leatherhead (KT23)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Unsure. Shading: None. Work Timescale: ASAP. Additional notes: GM.

06 May

Newark (NG23)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

05 May

Consett (DH8)

New Battery Installation (Solar PV)

Current system size: 12 x panels. Current inverter: unknown. Battery location: open to advice. Work Timescale: Within 6 Months.

05 May

Barnard Castle (DL12)

New Solar Thermal Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. Windows on roof: No. Work Timescale: ASAP.

05 May

Birmingham (B17)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

05 May

Hassocks (BN6)

New Solar PV Installation

Direction of roof * South Roof style *Pitched/Angled Roof material * Tiled Shading * None Any windows on roof? * Yes System size required? Open to advice Are(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue

Excellent service from Solar guide, able to find details of suitability of property for solar panels. Easy to complete forms and very pleased to quickly organise quotations. Now have solar panels installed with Green shoot renewables and very satisfied to be generating my own solar energy.

Christine

quote bottom

Very informative on how to get the best from solar panels. Salesman did not push to make a sale, better to give the information and allow me to make the decision in my own time.

patricia

quote bottom

I used solar guide to request quotes for a solar PV + battery installation on my roof. The website was easy to use, installation offers came in quickly and the solar guide team got in touch almost instantaneously to verify details about my request. All in all very good service. (I ended up choosing one of the installers registered to solar guide - see my other reviews.)

VT

quote bottom

What would you like to do now?

split shadow blue
Get Free Quotes Read More Reviews