• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Saltash

On average, our 2 Installers near Saltash are rated: (4.28/5)
Order:

At Wallop Energy we pride ourselves on giving the very best customer service.

Whatever your question, we are here for you 24/7 365 days a year.

location icon 7Th Floor, One Canada Square, London, E14 5AA

phone icon08006528800

Eco Greenenergy Solutions specialise in domestic and commercial installs, Solar PV, Solar Battery storage, Air source heat pumps, air to air and any other(...)

location icon Unit 30 Woodside Industrial Estate, Woodside, Thornwood, Epping, CM16 6LJ

phone icon08001114805

On average, our 2 Installers near Saltash are rated: (4.28/5)
Order:

location iconNearby we also have installers in Torpoint Plymouth and Calstock

Latest Job requests posted in Plymouth

08 Dec

Plymouth (PL9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month.

24 Oct

St. Austell (PL26)

New Solar PV Installation

Direction of roof: . Roof style: . Material: . Shading: . System size required: . Work Timescale: Within 3 Months. Additional notes: .

24 Aug

Wadebridge (PL27)

New Solar PV Installation - Online Quote

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: Within 1 Month.(...)

20 Feb

Liskeard (PL14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: to be advised. Work Timescale: Within 3 Months.

17 Nov

Launceston (PL15)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 5kwh/6.9kw. Work Timescale: ASAP. Additional notes:(...)

31 Oct

Padstow (PL28)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Metal. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.

03 Aug

St. Austell (PL25)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: 3.5kw. Work Timescale: Within 3 Months.

04 Jul

Plymouth (PL3)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: unsure. Battery location: outside wall. Work Timescale: ASAP. Additional notes: Tesla battery and tesla power wall.

31 May

Lifton (PL16)

Repair/Maintenance of Solar PV System

Current system size: 3kw. Work Timescale: Within 3 Months. Additional notes: Looking to add to an existing 3kw system and add a battery.

23 Apr

Looe (PL13)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Year.

23 Apr

Looe (PL13)

New Solar PV Installation

Current Fuel Used: Oil. Number of Bedrooms: 5+. Number of rooms: 16+. Property Age: After 1980. Insulation: Loft & Cavity wall. Windows: Double glazing. Work(...)

20 Apr

Torpoint (PL10)

Repair/Maintenance of Solar PV System

Current system size: 14 panels. Work Timescale: ASAP. Additional notes: * the storm has blown a panel off the roof, also damaged a further tile. One tile needs(...)

09 Apr

St. Austell (PL26)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice- 4.5kw. Work Timescale: Within 3(...)

01 Apr

St. Austell (PL26)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)

28 Mar

Tintagel (PL34)

New Solar Thermal Installation

Current Fuel Used: Oil. Number of Bedrooms: 4. Number of rooms: 11-15. Property Age: ····-····. Insulation: Loft only.(...)

25 Nov

Bodmin (PL30)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

08 Oct

Ivybridge (PL21)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.(...)

22 Sep

Tavistock (PL19)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: ASAP. Additional notes:(...)

20 Aug

Torpoint (PL11)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months. Additional notes:(...)

13 Aug

Callington (PL17)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional notes:(...)

23 Jul

St. Austell (PL25)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 3.6kwh. Work Timescale: ASAP.(...)

23 Jul

Liskeard (PL14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

13 Apr

Padstow (PL28)

New Solar PV Installation

Supply and fit of Solar PV And battery, pitched and tiled, no shading, no windows Timescale within 3 months. Contact anytime.

02 Dec

Plymouth (PL5)

New Solar PV Installation

Direction of roof: unsure. Flat and wooden. No shading. No windows. unsure of size. Interested in a battery. Install ASAP. Contact mornings.

21 Nov

Gunnislake (PL18)

New Solar PV Installation

Roof: South facing. Pitched. No shade. No windows on roof. Would like to discuss size of system required. Install within 1 month. Contact: morning.

09 Nov

Liskeard (PL14)

New Solar Thermal Installation

Roof facing: South. Pitched and slated. No shading and no windows. Open to advice on system size. Install ASAP. Contact anytime.

09 Nov

Liskeard (PL14)

New Solar PV Installation

Roof facing: South. Pitched and slated. No shading and no windows. Open to advice on system size. Install ASAP. Contact anytime.

30 Oct

Torpoint (PL11)

New Solar PV Installation

Roof: Pitched and slated. No shading. No windows in roof. Open to advise on system size. Install within 3 months. Contact anytime.

28 Aug

Bodmin (PL30)

New Solar Thermal Installation

Roof: South-East facing. Pitched and tiled. Slight shading from trees. No windows. Install ASAP Contact anytime.

12 Aug

Plymouth (PL1)

New Solar PV Installation

LOCAL INSTALLER ONLY> Roof facing: South. Pitched and slated. No shading and 1 velux. Open to advice on system size. Interested in battery. Install within 6(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue