• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Saltburn-By-The-Sea

On average, our 1 Installers near Saltburn-By-The-Sea are rated: (4.23/5)
Order:

We are a vastly experienced Renewable Energy Installer and Maintainer working nationally but based in Carlisle, Cumbria. Some of our clients include Councils,(...)

location icon Unit I Baron Way, Kingmoor Business Park, Carlisle, CA6 4SJ

phone icon01228642087

On average, our 1 Installers near Saltburn-By-The-Sea are rated: (4.23/5)
Order:

location iconNearby we also have installers in Redcar Guisborough and Middlesbrough

Latest Job requests posted in Cleveland

12 Feb

Hartlepool (TS25)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

30 Dec

Stockton-on-Tees (TS20)

New Battery Installation (Solar PV)

4kw. Unsure of inverter make. After advice on location.

16 May

Trimdon Station (TS29)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 6.5kw. Work Timescale: ASAP.

26 Apr

Hartlepool (TS25)

Repair/Maintenance of Solar PV System

Current system size: 2kw. Work Timescale: Within 6 Months. Additional notes: Wanting to extend their current PV system.

14 Apr

Hartlepool (TS25)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: ····-····. Insulation: Loft &(...)

06 Apr

Stockton-on-Tees (TS16)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: Before 1900. Insulation: Loft & Cavity wall. Windows: Single glazing. Work(...)

27 Jan

Redcar (TS11)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: unsure. Battery location: Loft. Work Timescale: ASAP.

24 Sep

Saltburn-by-the-Sea (TS13)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 5kw. Work Timescale: Within 3 Months.

04 Jun

Billingham (TS23)

Repair/Maintenance of Solar PV System

Current System: 10 panels (250W each). Customer looking to fit mesh in a rectangular pattern on his system. Install within the next 3 months. Contact any time(...)

07 May

Hartlepool (TS27)

New Solar PV Installation

Roof: West and East Facing. Pitched and Tiled. No Shading. No Windows. Open to advice on System Size. Install within 1 month. Contact Evenings and Weekends.

06 May

Hartlepool (TS27)

New Solar PV Installation

Install PV on the ground in garden. Garden: South facing. No shading. Open to advice on the size of the system. Interested in discussing a battery installation.(...)

25 Apr

Yarm (TS15)

New Solar PV Installation

Roof: South. Pitched and pantails. No shading. No windows on roof. Open to advice. Install ASAP. Contact anytime.

11 Jun

Stockton-on-Tees (TS18)

New Solar PV Installation

Roof direction:West/East. Pitched & tiled. No shading. No windows. Open to suggestions regarding system size and battery. Install: ASAP. Contact: anytime.

20 Feb

Billingham (TS23)

New Solar PV Installation

Roof facing: Unsure. Pitched and corrugated metal. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation.(...)

18 Nov

Stockton-on-Tees (TS17)

New Solar Thermal Installation

*Commercial property - not yet built - Drawings available* Roof direction: South/West. 30 degree Incline - aluminium. No shading. No windows. Open to(...)

11 Oct

Stockton-on-Tees (TS16)

Repair/Maintenance of Solar HW System

Size of system: 3 panels. All the times are set up but the system doesn't turn on when required. System is tied in with the underfloor heating. Repair ASAP.(...)

23 May

Stockton-on-Tees (TS19)

New Solar Thermal Installation

Solar Thermal. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 3 months. Contact anytime.

25 Jul

Stockton-on-Tees (TS21)

Repair/Maintenance of Solar HW System

Customer needs someone to come out and service the solar panels. Maintain: asap Contact: anytime

02 Jun

Redcar (TS11)

New Solar PV Installation

Solar PV system required for newly renovated property. L shaped building with large roof. Pitched and tiled. No shading. No windows on the roof. Would like to(...)

12 Apr

Guisborough (TS14)

New Solar PV Installation

Roof: South facing. Flat (double garage). No shading. No windows. Open to advice on the size of the system needed but would need over 4Kw. Install within 6(...)

23 Mar

Hartlepool (TS25)

Repair/Maintenance of Solar PV System

Carry out a service on my solar thermal system I would a quote for the service and details of the works. Inverter is a Grant system. Service within 1 month(...)

29 Jan

Redcar (TS11)

Repair/Maintenance of Solar PV System

I have an intermittent fault on my solar power (PV) installation. The inverter shows a ground fault (<600k Ohms IR) on one of the two PV panel circuits and no(...)

19 Jan

Saltburn-by-the-Sea (TS12)

Repair/Maintenance of Solar PV System

We require maintenance on our "Evacuated tube Solar Panel". One of the tubes has fractured so we need it replaced and also a more general review of the(...)

07 Dec

Middlesbrough (TS4)

New Solar PV Installation

Solar PV: roof face South, pitched and tiled. Supply and fit of 16 panels, 4 kw system. Timescale within 6 months. Contact anytime.

27 Jul

Hartlepool (TS24)

New Solar PV Installation

9 x new build bungalows require solar panels. Roof: 8 x South facing, 1 x west facing. Pitched and tiled. No shading. No windows on roof. Plans available. (...)

24 Jul

Middlesbrough (TS9)

New Solar PV Installation

Roof: South facing. Pitched and tiled. No shading. Veluw windows. Open to advice of number of panels. Install within 3 months. Contact AM. **local(...)

25 Apr

Yarm (TS15)

Repair/Maintenance of Solar PV System

Maintenance of a 5 year old solar pv system

20 Dec

Stockton-on-Tees (TS21)

New Solar Thermal Installation

water panels may be electric as well with batterys

19 Oct

Middlesbrough (TS9)

New Solar PV Installation

Solar PV. Barn Roof - 15 degrees slope - Faces South. No Shading. Timescale within 3 month. Contact anytime. Email Preferred as out on land.

11 Oct

Stockton-on-Tees (TS17)

Repair/Maintenance of Solar HW System

I need the glycol topping up or drained and replaced in my solar thermal panels

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue