• pen icon Complete our simple form
  • quote icon Up to 3 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Isle Of Harris

On average, our 8 Installers near Isle Of Harris are rated: (4.19/5)
Order:

AES Solar are the UK’s original solar heating system manufacturer in Forres, Scotland. Our company has been involved in Solar Thermal water heating since 1979(...)

location icon Lea Road, Forres, IV36 1AU

phone icon01309676911

Knowledgeable, Reliable Installers, Specialising In Solar Pv, Electrical Contracting & Ev Charging.

location icon C/O Horizon Ca 11 Somerset Place, Glasgow, G3 7JT

phone icon07936982272

We specialise in the planning, operation and maintenance of solar pv, inverters and battery storage systems. We offer excellent solar services to ensure that(...)

location icon 140 Norwood Road, Southport, PR8 6EH

phone icon08003891825

We are the largest installer of Solar PV in the Highlands, Grampian and Aberdeen. A forth generation family business of 60 years standing with 100 staff we are(...)

location icon 1 Longman Drive, Inverness, IV1 1SU

phone icon01463238000

All Renewable Energy Ltd is MCS accredited installer. This allows customers to access available government grants. We design, supply, install and commission:(...)

location icon Office 8 Friarton House, Friarton Road, Perth, PH2 8BB

phone icon0800 002 9175

An Award winning Building services company established for more than 15 years, G&H Groups reputation within the building services industry is unrivalled.(...)

location icon Unit 1-2A, Spence Mills, Leeds, LS13 3HE

phone icon01132556433

Genfit specialise in solar PV, solar thermal, biomass and wind turbines.

location icon Evans Business Centre Chester West Employment Park, Minerva Avenue, Chester, CH1 4QL

phone icon0344 567 9032

Family run company, Operating for over 25 years,Offering turnkey solutions for small to large projects. We specialise in Photo voltaic systems (PV) Solar(...)

location icon Unit 18 Whaddon Business Park, Whaddon, Salisbury, SP5 3HF

phone icon01794 516004

On average, our 8 Installers near Isle Of Harris are rated: (4.19/5)
Order:

location iconNearby we also have installers in Isle Of Scalpay Stornoway and Isle Of Lewis

Latest Job requests posted in the United Kingdom

27 Jan

Redcar (TS11)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: unsure. Battery location: Loft. Work Timescale: ASAP.

26 Jan

Ashford (TN27)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: Yes - Nearby tree. System size required: be advised. Work Timescale: Within 3 Months.(...)

26 Jan

Sevenoaks (TN14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

26 Jan

Bishop Auckland (DL14)

Repair/Maintenance of Solar HW System

Current system size: 14 panels. Work Timescale: ASAP.

25 Jan

Glasgow (G63)

New Solar PV Installation

Direction of roof: North East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4.5kw. Work Timescale: Within 3 Months.

25 Jan

Lancing (BN15)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 6 Months.

25 Jan

Ascot (SL5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: ASAP.

25 Jan

Machynlleth (SY20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale: Within(...)

25 Jan

London (W4)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Unsure. Roof style: Flat. Shading: None. Windows on roof: Yes. Work Timescale: Within 1 Month.

25 Jan

Pembroke Dock (SA72)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice, 4kw approx. Work Timescale: Within 6(...)

25 Jan

Kirkcaldy (KY1)

New Solar PV Installation

Direction of roof: South East. Roof style: Flat. Material: Other. Shading: None. System size required: Open to suggestion. Work Timescale: ASAP.

25 Jan

Cambridge (CB23)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: Open to advice. Work Timescale: ASAP.(...)

25 Jan

Lincoln (LN6)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice - approx 3kw. Work Timescale:(...)

25 Jan

Coventry (CV5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.

25 Jan

Dronfield (S18)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

24 Jan

Derby (DE65)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 3(...)

23 Jan

Coleford (GL16)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 6kw. Work Timescale: Within 3 Months.

23 Jan

Gosport (PO13)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

23 Jan

Wantage (OX12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 1(...)

22 Jan

Andover (SP11)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Open to advice. Work Timescale: Within(...)

21 Jan

Coulsdon (CR5)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Flat. Shading: None. Windows on roof: No. Work Timescale: ASAP. Additional notes: Look into heating a(...)

21 Jan

Leyland (PR25)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.

21 Jan

Burntwood (WS7)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

20 Jan

Wilmslow (SK9)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months. Additional notes:(...)

20 Jan

Spalding (PE11)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice - approx 3.505kw. Work Timescale:(...)

20 Jan

Shepton Mallet (BA4)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: no idea- needs to discuss. Work Timescale: Within 3(...)

20 Jan

Hemel Hempstead (HP2)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

20 Jan

Colchester (CO6)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

20 Jan

Guildford (GU3)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 6kwh. Work Timescale: Within 6 Months.

20 Jan

Sunderland (SR2)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4 panels. Work Timescale: ASAP. Additional notes: 1(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue

The service was easy to use and I was contacted very quickly by the first supplier which I eventually contracted with, they quoted for a system which was good but I wanted more panels which was arranged very easily.

Mike H

quote bottom

Great service,helpful advisor and very quick response to online enquiry.

Jan

quote bottom

Fast response and produced three local installers to provide competetive quotes. Makes finding potential reliable contractors so easy.

TonyP

quote bottom

What would you like to do now?

split shadow blue
Get Free Quotes Read More Reviews