• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in New Milton

On average, our 3 Installers near New Milton are rated: (4.59/5)
Order:

Family run company, Operating for over 25 years,Offering turnkey solutions for small to large projects. We specialise in Photo voltaic systems (PV) Solar(...)

location icon Unit 18 Whaddon Business Park, Whaddon, Salisbury, SP5 3HF

phone icon01794 516004

Over 9 Years experience installing Solar PV, please see our checkatrade page here- > https://www.checkatrade.com/InfinityEnergyServicesLtd/

We cover a radius(...)

location icon 35 Gullycroft Mead, Hedge End, Southampton, SO30 4SR

phone icon08009098882

ECH Group Ltd has been established in the Solar PV Market for over 12 years now, completing well over 15,000 installation both Domestic & Commercial. ECH Group(...)

location icon 1 Manor Court, 6 Barnes Wallis Road, Fareham, PO15 5TH

phone icon01329830324

On average, our 3 Installers near New Milton are rated: (4.59/5)
Order:

location iconNearby we also have installers in Christchurch Lymington and Brockenhurst

Latest Job requests posted in Bournemouth

22 Apr

Poole (BH14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

31 Aug

Broadstone (BH18)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Unsure. Shading: Yes - Nearby building. System size required: to be advised. Work Timescale: Within 1(...)

07 Mar

Wareham (BH20)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: no open to advice. Work Timescale: ASAP.

05 Mar

Poole (BH14)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Year.(...)

18 Feb

Poole (BH13)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: Within 1 Month.

24 Nov

Poole (BH15)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.

15 Nov

Poole (BH13)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Unsure. Roof style: Flat. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months.

11 Aug

Poole (BH15)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

07 Jul

Bournemouth (BH9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Month.

15 Jun

New Milton (BH25)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

08 Jun

Bournemouth (BH7)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

20 May

Poole (BH13)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice required. Work Timescale: ASAP.

11 Apr

New Milton (BH25)

New Battery Installation (Solar PV)

Current system size: 3.48kwh. Current inverter: Sunny boy. Battery location: Garage. Work Timescale: ASAP.

11 Apr

Bournemouth (BH8)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

20 Mar

Ringwood (BH24)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

02 Feb

Poole (BH12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Advice from installer. Work Timescale: ASAP.(...)

19 Jan

Bournemouth (BH6)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months. Additional notes: 1(...)

17 Jan

Bournemouth (BH6)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Year.

05 Jan

Bournemouth (BH5)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Month.

05 Jan

Bournemouth (BH5)

New Solar PV Installation

Current Fuel Used: Gas. Current system: Halstead. Age: Over 16 yrs. Condition: Not working. Location: Upstairs kitchen, relocate to bathroom. Flue location:(...)

18 Nov

Swanage (BH19)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Open to suggestions. Work Timescale:(...)

08 Nov

Poole (BH14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to suggestion. Work Timescale: ASAP.

05 Nov

Ringwood (BH24)

Repair/Maintenance of Solar PV System

Work Timescale: Within 3 Months. Additional notes: Has PV Solar. Needs to change inverter - Faronis GTL 360.

11 Oct

Ringwood (BH24)

New Solar PV Installation

Current Fuel Used: Oil. Current system: Worcester Greenslave. Age: 11 - 15 yrs. Condition: Working. Location: utility room. Work Timescale: Within 1 Month.

28 Aug

New Milton (BH25)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.(...)

20 Aug

Bournemouth (BH2)

Repair/Maintenance of Solar PV System

Current system size: 18 panels. Work Timescale: Within 3 Months. Additional notes: needing the panels moving and wanting to take them to the new property.

24 Apr

Poole (BH14)

New Solar PV Installation

Roof: Flat and Concrete. There is a tree that may effect the shading on the panels. There are no windows in the roof. Looking for advice on the size system(...)

23 Apr

Poole (BH15)

New Solar PV Installation

Roof: South. Pitched and Tiled. There is no shading that will effect the panels. There are velux windows in the roof. Looking for advice on the size system(...)

22 Apr

Ringwood (BH24)

New Solar PV Installation

Roof direction: various. Pitched & tiled. Some shading from trees. 2 x skylights. Open to suggestions regarding system size and battery. Install: within 3(...)

20 Apr

Poole (BH13)

Repair/Maintenance of Solar HW System

Thermomax solar system - 30 tube system . Seems to be a loose connection as meter is temperamental. Maybe service too but am looking for minimal cost.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue