• pen icon Complete our simple form
  • quote icon Up to 3 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Guernsey

On average, our 1 Installers near Guernsey are rated: (3.94/5)
Order:

5* Google reviews.
21/09/2017 - What was promised, was delivered on time and on budget. I would recommend this company very highly. Peter & Yvonne. M24

location icon 140 Norwood Road, Southport, PR8 6EH

phone icon0800 3891825

On average, our 1 Installers near Guernsey are rated: (3.94/5)
Order:

location iconNearby we also have installers in Jersey Portland and Salcombe

Latest Job requests posted in the United Kingdom

16 Aug

Bognor Regis (PO22)

New Battery Installation (Solar PV)

16 panels 4kw system. Battery to be installed preferably in a cupboard? Install within 3 months depending on quotes. Contact anytime.

15 Aug

London (EC1A)

New Solar PV Installation

Roof direction: East/ West. Pitched & tiled. No shading or windows. Open to suggestions regarding system size and battery. Install: within 6 months. Contact:(...)

15 Aug

Coventry (CV4)

New Solar PV Installation

Roof direction: West. pitched & tiled. No shading. No windows. Open to suggestions regarding system size and battery. Install: within 3 months. Contact:(...)

15 Aug

Ryde (PO33)

New Solar Thermal Installation

Roof direction: South. Pitched & asbestos. No shading. 2 x Dorma windows. Open to suggestions regarding system size. Install: within 1 year. Contact: anytime.(...)

14 Aug

Worcester (WR6)

New Solar PV Installation

Roof facing; South. Pitched and tiles. No shading. No windows. Unsure on battery installation. Open to advice from installers regarding system size. Install(...)

13 Aug

Portsmouth (PO6)

New Battery Installation (Solar PV)

Current System: 3kwH. Current Inverter: Unsure of make. Location for Battery: Open. Install within 3 month. Contact evenings.

13 Aug

Eastleigh (SO53)

New Battery Installation (Solar PV)

Current System: 14 panels Current Inverter: Unsure of make. Location for Battery: Open to advice. Install ASAP. Contact anytime.

13 Aug

Kidderminster (DY10)

New Battery Installation (Solar PV)

Current system: 3.84Kwh. Current inverter: Sunny boy 3000tl. Open to advice on location of battery. Install within 1 month and contact anytime.

12 Aug

Tunbridge Wells (TN3)

New Solar PV Installation

Roof facing; South. Pitched and tiled. No obvious shading. No windows. Open to advice regarding system size. Looking for a battery installation also. Install(...)

12 Aug

London (W5)

New Solar Thermal Installation

Roof direction: South. Pitched & tiled. No shading. 1x window and 1 x skylight. Open to suggestions regarding system size. Install: within 6 months. Contact:(...)

12 Aug

Towcester (NN12)

New Solar PV Installation

Roof: All directions facing. Pitched and slated. There is a chimney on the roof. No windows. Install within 6 month. Contact late afternoons and evenings.

12 Aug

Barton-upon-Humber (DN18)

New Battery Installation (Solar PV)

Current System: 8 panels on either side of the roof Current Inverter: Unsure of make. Location for Battery: Open to advice. Install within 3 month.(...)

12 Aug

Pontefract (WF8)

New Solar PV Installation

Solar PV. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 1 year. Contact anytime.

12 Aug

St. Neots (PE19)

New Battery Installation (Solar PV)

Current System: 4kWH 12 panels. 15 y/o Current Inverter: 2 months old inverter. Location for Battery: Attached garage wall but open to advice. Install(...)

12 Aug

London (E17)

New Solar PV Installation

Roof direction: unsure. Pitched & tiled. No shading. no windows. Open to suggestions regarding system size and battery. Install: within 3 months. Contact:(...)

10 Aug

Cambridge (CB4)

New Solar PV Installation

Supply and fit of Solar PV. Roof direction: South/North. Pitched and slate. Possible shading from neighbouring tree. No windows. Open to suggestions regarding(...)

09 Aug

Birmingham (B37)

New Solar PV Installation

Roof facing east/west, pitched, tiled, possible shading from tree, no windows. Approximately 18 panels (this is what he has been quoted for previously). Install(...)

09 Aug

Barnsley (S73)

New Solar PV Installation

Unsure which direction roof faces. Pitched and tiled. No shading. No windows on roof but there are 2 light tubes fitted (each 15 inches in diameter). Would like(...)

09 Aug

Waterlooville (PO8)

New Solar PV Installation

Direction of roof: South facing. Garage roof Pitched, metal. No shading. Call anytime. Install within 3 months.

09 Aug

Neath (SA11)

Repair/Maintenance of Solar HW System

Current System: Unsure of size Repair ASAP - circulating pump. Contact anytime.

07 Aug

Bathgate (EH48)

New Solar Thermal Installation

Roof direction: South. Pitched and slate. Shading in the winter from neighbouring trees. No windows. Install: within 3 months. Contact: evenings

07 Aug

Kidderminster (DY10)

Repair/Maintenance of Solar PV System

***Request local installer*** Current system: 8 Panels. Not working. Repair ASAP and contact anytime.

07 Aug

St. Agnes (TR5)

New Solar Thermal Installation

Roof direction: unsure. Pitched & slate. No shading. No windows. Open to suggestions regarding system size.3 Install: within 3 months. Contact: anytime.

07 Aug

Ilkeston (DE7)

New Solar PV Installation

Needs solar PV and Solar Thermal system to be fitted to a cabin next to stables. The PV system would just need to power small appliances and the thermal system(...)

07 Aug

Dagenham (RM9)

New Solar PV Installation

Current Boiler: Unsure. Pitched & tiled. No shading. No windows. Open to suggestions regarding system size and battery. Install: ASAP. Contact: anytime.

07 Aug

Retford (DN22)

New Solar Thermal Installation

Roof direction: East/West. Pitched and tiled. No shading. No windows. Open to suggestions regarding system size. Install: within 3 months. Contact: anytime. Has(...)

06 Aug

London (SW1W)

New Solar PV Installation

***Has plans for build*** Open to advice on system size and battery. Install within 1 month and contact anytime. Left side of roof 7.13m2 (skylight located(...)

06 Aug

West Kilbride (KA23)

New Solar PV Installation

Roof facing west, pitched, slate, no shading, no windows, unsure on size, Contact anytime. Install asap.

06 Aug

Barnsley (S75)

New Battery Installation (Solar PV)

Current system: 4Kwh. Current inverter: Will confirm on call. Open to advice on location of battery. Install within 1 month and contact anytime.

06 Aug

Kelso (TD5)

Repair/Maintenance of Solar HW System

making funny noises. Timescale within 1 month. Contact anytime.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue

Very good Assistance

Khalid Lorgat

quote bottom

I had lots of replies and keen people who wanted to supply me.

Marjorie Pennington

quote bottom

From initial contact the information from Matthew and Halo renewable was excellent. No hard sell just honest guidance on what would be the best set up for my needs. Solar PV is saving me £100s and heating water for free and saving gas costs too. My system is far exceeding any of my expectations and in under 30 days has generated 340Kwh of free electric. Very highly recommended and all tradespeople are skilled, tidy, polite and professional. With the cost of electricity only ever going to go up it's a no brainer.

MR ANDREW KILDING

quote bottom

What would you like to do now?

split shadow blue
Get Free Quotes Read More Reviews