• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Wolverhampton

On average, our 14 Installers near Wolverhampton are rated: (4.66/5)
Order:

Princeenergy (formerly Princesolar) is a trading division of Princebuild Limited, one of the Eastern Regions most trusted family Building Maintenance and(...)

location icon Empson Road, Peterborough, PE1 5UP

phone icon08456007800

Mypower design, supply and install solar photovoltaic (PV) systems which enable you to generate your own electricity and help your business to reduce its long(...)

location icon Quercus House, Orchard Industrial Estate, Toddington, Cheltenham, GL54 5EB

phone icon01242 620894

At Solartech Installations Ltd our aim is to help you save money on your energy bills and to do a your bit to reduce CO2 emissions.

location icon 6 Oakwood Court Esless Park, Lostock Gralam, Rhostyllen, LL14 4DQ

phone icon01606 42853

JBR Electrical Contractors Ltd

location icon 74 Oldfield Road, Hampton, TW12 2HR

phone icon02080754675

At Wallop Energy we pride ourselves on giving the very best customer service.

Whatever your question, we are here for you 24/7 365 days a year.

location icon 7Th Floor, One Canada Square, London, E14 5AA

phone icon08006528800

Boilers, Air con, PV Solar, Batteries and EV Charging Experts.

location icon Floor 5, Avalon, 26-32 Oxford Road, Bournemouth, BH8 8EZ

phone icon03301139488

RECC and MCS accredited installer based in Wolverhampton, we are proud to call ourselves Solar PV Specialists.

location icon Unit B2, Hilton Main Industrial Estate, Wolverhampton, WV11 2BE

phone icon01902248684

Volt Energy Ltd are based in the north Birmingham area covering the west midlands area.

location icon 45 Clayhanger Lane, Walsall, WS8 7DS

phone icon01216477108

Dodd Group is a family owned business that is one of the country`s leading privately owned Electrical and Mechanical Engineering firms. We specialise in the(...)

location icon Stafford Park 13, Telford, TF3 3AZ

phone icon01952 290290

Solar PV and battery storage installation

location icon 8 Antler Drive, Rugeley, WS15 2XS

phone icon07972706954

TBS suppliers of the finest integrated solar pv systems, from BIPV modules to solar roof tiles, similar to Tesla solar roof tiles.

location icon Park View House, Bow Street, Rugeley, WS15 2DJ

phone icon01889 221050

We are a small independant solar specialist company not tied to any manufacturer so are able to offer a wide range of products.

location icon 7 Hawkesmoor Drive, Lichfield, WS14 9YH

phone icon01543 317609

Renewable installation specialists with custom built demonstration centre in the heart of Staffordshire.

location icon 4 Titan Way, Britannia Enterprise Park, Lichfield, WS14 9TT

phone icon01543897195

As one of the Midland’s new generation of ‘green’ heating and power installers, RENUVO offer a broad range of central heating and renewable energy(...)

location icon Unit 1, Kingsbury Link, Trinity Road, Tamworth, B78 2EX

phone icon01827 870 950

On average, our 14 Installers near Wolverhampton are rated: (4.66/5)
Order:

location iconNearby we also have installers in Bilston Willenhall and Tipton

Latest Job requests posted in the United Kingdom

14 May

Bracknell (RG42)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

14 May

Pontyberem (SA15)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

13 May

Wrecsam (LL12)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Unsure. Shading: None. Work Timescale: ASAP.

13 May

Wrecsam (LL12)

New Solar PV Installation with Battery

Direction of roof: North. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: ASAP. Additional notes: Property is currently vacant.

13 May

Milton Keynes (MK19)

Repair/Maintenance of Solar PV System

Current system size: 3.8kw. Work Timescale: ASAP.

13 May

St Austell (PL26)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

12 May

Carrickfergus (BT38)

New Solar PV Installation

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

11 May

Cheadle (SK8)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP. Additional notes: Renovations.

10 May

New Malden (KT3)

New Solar PV Installation with Battery

Current Fuel Used: Gas. Brand of current system: Don't Know. Work Timescale: ASAP (I may have no heating or hot water).

09 May

Hampton (TW12)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

08 May

Derby (DE23)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. Work Timescale: Within 6 Months. Additional notes: In process of(...)

08 May

Brighton (BN41)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 3 Months. Additional(...)

08 May

Skelmersdale (WN8)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 3 Months. Additional notes:(...)

07 May

Corwen (LL21)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Shading: Yes - Nearby tree. Work Timescale: Within 6 Months.

07 May

King's Lynn (PE31)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

07 May

Thame (OX9)

New Solar PV Installation - Remote Quote

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months. Property Ownership: Potential Homebuyer.

06 May

Chippenham (SN14)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 6 Months. Additional notes: +++++ NEW BUILD -(...)

03 May

London (W4)

New Solar PV Installation with Battery

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Year.

03 May

London (W4)

New Solar PV Installation

Direction of roof: . Roof style: . Material: . Shading: . System size required: . Work Timescale: . Additional notes: .

02 May

Cranbrook (TN17)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 3 Months. Additional(...)

01 May

Margate (CT9)

New Solar PV Installation

Direction of roof: East. Roof style: Flat. Material: Unsure. Shading: None. Work Timescale: ASAP. Additional notes: FIRST AND SECOND FLOOR FLAT..

30 Apr

Chesterfield (S41)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

29 Apr

London (SE19)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Flat. Material: Wood. Shading: None. Work Timescale: ASAP.

27 Apr

Bideford (EX39)

New Battery Installation (Solar PV)

Current system size: 15 panels. Current inverter: Fronius Primo. Battery location: Shed or Workshop. Work Timescale: Within 6 Months.

27 Apr

Watford (WD19)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

26 Apr

High Wycombe (HP12)

New Battery Installation (Solar PV)

Direction of roof: . Roof style: . Material: . Shading: . System size required: . Work Timescale: ASAP. Additional notes: .

26 Apr

Gloucester (GL2)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

26 Apr

Chelmsford (CM2)

Repair/Maintenance of Solar PV System

Work Timescale: Within 3 Months.

26 Apr

Cwmbran (NP44)

Repair/Maintenance of Solar PV System

Work Timescale: ASAP. Additional notes: has the circuit board, wanting this to be installed.

25 Apr

Coalville (LE67)

Repair/Maintenance of Solar PV System

Current system size: 16 panels. Work Timescale: Within 1 Month.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue