• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Gatwick

On average, our 3 Installers near Gatwick are rated: (4.17/5)
Order:

Save money on your energy bills and get between 12-20% returns under the latest FIT tariff.
We also install solar panels with EnPhase micro inverters,(...)

location icon C/O Big Yellow Storage Unit 1 Cobbett Park, 22 To 28 Moorfield Road, Slyfield Industrial Estate, Guildford, GU1 1RU

phone icon0800 888 6544

We carry out all manner of electrical work, our domestic services include small to large works, from fault finding to full rewires, new sockets and more. We(...)

location icon 26 Bourne Road, Farncombe, Godalming, GU7 3NH

phone icon01483 429989

JBR Electrical Contractors Ltd

location icon 74 Oldfield Road, Hampton, TW12 2HR

phone icon02080754675

On average, our 3 Installers near Gatwick are rated: (4.17/5)
Order:

location iconNearby we also have installers in Horley Crawley and Reigate

Latest Job requests posted in Redhill

10 Apr

Billingshurst (RH14)

New Solar PV Installation - Remote Quote

Work Timescale: Within 1 Month. Additional notes: move in on the 19th of April.

10 Feb

Horsham (RH12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

06 Dec

OXTED (RH8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

24 Oct

Billingshurst (RH14)

New Solar PV Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Work Timescale: Within 3 Months.

25 Aug

Burgess Hill (RH15)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: 12 kwatts. Work Timescale: Within 6 Months. Additional(...)

19 Jul

East Grinstead (RH19)

Solar PV Battery (Repair/Maintenance)

Current system size: 12 panels. Current system: Samsung. Work Timescale: ASAP.

12 May

Oxted (RH8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Take Advice. Work Timescale: Within 3 Months.(...)

15 Dec

Reigate (RH2)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3(...)

16 Nov

Horsham (RH13)

New Solar PV Installation

Direction of roof: South. Roof style: Other. Material: Other. Shading: None. System size required: advice needed. Work Timescale: ASAP. Additional notes: alt.(...)

10 Oct

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

05 Oct

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

24 Aug

Burgess Hill (RH15)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5+. Required location: advice needed. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft & Cavity(...)

19 Aug

Lingfield (RH7)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Year.(...)

16 Aug

Horley (RH6)

New Battery Installation (Solar PV)

Current system size: 1.28kw. Current inverter: unsure. Battery location: open to advice. Work Timescale: Within 3 Months.

16 Aug

Horley (RH6)

New Solar Thermal Installation

Direction of roof: South West. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

04 Aug

Crawley (RH10)

New Solar PV Installation

Current Fuel Used: Oil.

03 Aug

Crawley (RH10)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale: ASAP.

25 May

Redhill (RH1)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

18 May

Horsham (RH13)

New Battery Installation (Solar PV)

Current system size: 4kW X 2 systems. Current inverter: unknown. Battery location: Open to suggestions. Work Timescale: ASAP.

28 Apr

Horsham (RH12)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6 Months.

19 Apr

Godstone (RH9)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: ····-····. Insulation: Loft & Cavity(...)

19 Apr

Horsham (RH12)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 3(...)

11 Apr

Crawley (RH10)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months.

30 Mar

Horsham (RH13)

New Solar PV Installation

Current Fuel Used: Oil. Number of Bedrooms: 4. Number of rooms: 11-15. Property Age: ····-····. Insulation: Cavity wall(...)

29 Mar

Redhill (RH1)

New Solar PV Installation

Solar PV and battery, pitched and tiled. No windows, no shading, Timescale ASAP. Property House, owner

10 Mar

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Advice from installer - 5KW. Work Timescale:(...)

10 Mar

Haywards Heath (RH17)

New Solar PV Installation

Direction of roof: South. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to suggestions. Work Timescale: Within 3 Months.(...)

07 Mar

Dorking (RH5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4-5kw. Work Timescale: ASAP.

02 Mar

Redhill (RH1)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 24kw. Work Timescale: Within 1 Year.

06 Feb

Crawley (RH11)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: ASAP.(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue