• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Lytham St. Annes

On average, our 4 Installers near Lytham St. Annes are rated: (4.44/5)
Order:

At Wallop Energy we pride ourselves on giving the very best customer service.

Whatever your question, we are here for you 24/7 365 days a year.

location icon 7Th Floor, One Canada Square, London, E14 5AA

phone icon08006528800

Solargen are solar installers and quality electrical contractors covering the whole of the North West.

location icon Unit 29-30 Momentum Business Park, Momentum Place, Bamber Bridge, PR5 6EF

phone icon0800 1123 571

Off-grid specialists in renewable electricity generation, storage, UPS and power management.

location icon 78 Mill Lane, Appley Bridge, Wigan, WN6 9DD

phone icon0800 4647110

Air Source Heat Pumps, Solar PV, Boiler Installation, Solar Thermal

location icon Capability House, North Mersey Business Centre, Liverpool, L33 7UY

phone icon01513197714

On average, our 4 Installers near Lytham St. Annes are rated: (4.44/5)
Order:

location iconNearby we also have installers in Blackpool Poulton-Le-Fylde and Southport

Latest Job requests posted in the United Kingdom

24 Apr

Waltham Cross (EN8)

New Solar PV Installation

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month.

23 Apr

Leamington Spa (CV32)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Tiled. Shading: Yes - Nearby tree. Work Timescale: Within 3 Months. Customer would like solar panels(...)

23 Apr

Yr Wyddgrug (CH7)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Year.

22 Apr

Poole (BH14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

22 Apr

High Wycombe (HP14)

New Solar PV Installation

Direction of roof: Multiple. Roof style: Multiple. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

18 Apr

Romford (RM7)

New Solar PV Installation - Remote Quote

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP. Property Ownership: Property Owner.

17 Apr

Newport (NP30)

Repair/Maintenance of Solar PV System

Work Timescale: ASAP.

16 Apr

Bath (BA2)

New Solar PV Installation with Battery

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Year. Additional notes: PHas design plans.

15 Apr

Sunderland (SR6)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months. Additional notes:(...)

15 Apr

Sunderland (SR6)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months. Additional notes: sister bought extension(...)

15 Apr

Carnforth (LA5)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 3 Months. Additional notes: Currently using(...)

13 Apr

Hereford (HR1)

New Solar Thermal Installation

Direction of roof: North East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Month.

10 Apr

Billingshurst (RH14)

New Solar PV Installation - Remote Quote

Work Timescale: Within 1 Month. Additional notes: move in on the 19th of April.

09 Apr

Epping (CM16)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

08 Apr

Llwyngwril (LL37)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Year.

08 Apr

Edinburgh (EH17)

New Battery Installation (Solar PV)

Current system size: 9 panels. Current inverter: Solor Edge. Battery location: Open to advice. Work Timescale: ASAP.

08 Apr

Basingstoke (RG21)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month.

05 Apr

Buntingford (SG9)

New Battery Installation (Solar PV)

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 1 Month. Additional notes: .

04 Apr

Chippenham (SN15)

New Battery Installation (Solar PV)

Current system size: 10 panels, 2 x 5kw batteries, 2.6kw inverter. Current inverter: Sun Sync. Battery location: Open to advice. Work Timescale: Within 6(...)

04 Apr

Edinburgh (EH11)

New Solar PV Installation with Battery

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months. Additional notes: +++ possible roof(...)

04 Apr

Newcastle (ST5)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP. Additional notes: Call after 3pm.

30 Mar

Liverpool (L23)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

28 Mar

Falmouth (TR11)

New Battery Installation (Solar PV)

Direction of roof: . Roof style: . Material: . Shading: . System size required: . Work Timescale: Within 1 Month. Additional notes: .

27 Mar

London (NW11)

New Solar PV Installation

Not Applicable

27 Mar

Wallasey (CH45)

New Solar PV Installation with Battery

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Year.

27 Mar

Derby (DE22)

New Solar PV Installation

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

27 Mar

Kinross (KY13)

New Battery Installation (Solar PV)

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: . Work Timescale: Within 3 Months. Additional(...)

26 Mar

Glasgow (G52)

New Battery Installation (Solar PV)

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: . Work Timescale: Within 3 Months.(...)

26 Mar

Alexandria (G83)

New Battery Installation (Solar PV)

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: . Work Timescale: Within 6 Months.(...)

19 Mar

Merthyr Tudful (CF47)

New Solar PV Installation with Battery

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. Work Timescale: Within 1 Year.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue