• pen icon Complete our simple form
  • quote icon Up to 3 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Lechlade

On average, our 3 Installers near Lechlade are rated: (4.37/5)
Order:

Specialist in all renewable aspects including Solar PV, Battery Storage and Air Source Heat Pumps. We are RHI installer of the year for the South East region(...)

location icon Queen Court, 9-17 Eastern Road, Romford, RM1 3NH

phone icon07736740237

Eco Greenenergy Solutions specialise in domestic and commercial installs, Solar PV, Solar Battery storage, Air source heat pumps, air to air and any other(...)

location icon Unit 30 Woodside Industrial Estate, Woodside, Thornwood, Epping, CM16 6LJ

phone icon08001114805

Heating, plumbing, air conditioning, Solar Hot water, Solar electric, Air and Ground source Heat pump systems, Biomass boilers. based in Gillingham, Dorset.

location icon Mere Road, Peacemarsh, Gillingham, SP8 4EU

phone icon01747 825222

On average, our 3 Installers near Lechlade are rated: (4.37/5)
Order:

location iconNearby we also have installers in Fairford Faringdon and Carterton

Latest Job requests posted in Gloucestershire

05 Nov

Tewkesbury (GL20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: 4-5kwh. Work Timescale: ASAP.

01 Nov

Cheltenham (GL54)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale: ASAP.

07 Oct

Cheltenham (GL54)

Repair/Maintenance of Solar HW System

Current system size: 2 x panels. Work Timescale: ASAP. Additional notes: Please let ring a little longer as takes a while to get to the phone Service of(...)

20 Sep

Cheltenham (GL53)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: medium - open to suggestions. Work Timescale: ASAP.

08 Apr

Gloucester (GL19)

New Solar Thermal Installation

Roof facing: South. Slate and other material. No shading. No windows. Open to advice on system size. There is a hot water cylinder. Is there currently any(...)

13 Dec

Coleford (GL16)

New Solar Thermal Installation

*Property not built yet, All plans are available* Roof: South Facing. Pitched and Slated. No Shading. No windows. Open to suggestions on system size. Install(...)

26 Nov

Cheltenham (GL52)

Repair/Maintenance of Solar PV System

One panel KPV MEEC 220 WP panels has impact marks and has shattered and is presumably not operating. The panel is abutting the ridge so can be accessed from the(...)

12 Oct

Gloucester (GL19)

New Solar PV Installation

House is grade II listed so would like to have panels on a barn building near to main house. Barn roof: South facing. Pitched and corrugated steel. Slight(...)

03 Oct

Cheltenham (GL52)

New Solar PV Installation

Facing: West/east pitched and tiled. No shading, 2 small windows. Install within 3 months. Discuss options - we currently have hot air heating via a Brink B-23D(...)

02 Oct

Cheltenham (GL52)

New Solar PV Installation

Roof facing: West East. Pitched and tiled. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation. Install: 1(...)

03 Aug

Cheltenham (GL52)

New Solar PV Installation

Roof: unsure. Pitched and Tiled. There is no shading that will effect the panels. No windows in the roof. Looking for advice on the size system needed. Install(...)

29 Jul

Newent (GL18)

New Solar PV Installation

Roof: Garage West. Pitched and Tiled. There is no shading that will effect the panels. There are no windows in the roof. Looking for advice on the size system(...)

29 Jul

Stonehouse (GL10)

Repair/Maintenance of Solar HW System

Attention needed for solar thermal system. It is making loud screeching noises and clanking, have turned it off completely, as it did not sound safe.

17 Jul

Lydney (GL15)

New Solar PV Installation

Roof: unsure. Pitched and other. No shading. No windows. Size system: open to advice. Install ASAP. Contact anytime. ex stable building/ garden house.

26 Jun

Stroud (GL6)

New Solar PV Installation

Roof: East facing. Pitched and concrete tiles. Some shading from hit roofs with windows, and 2 small vellux windows. Install ASAP. Contact DAYTIME.

18 Apr

Cheltenham (GL53)

New Solar PV Installation

Roof:South.Pitched and Slate.There is no shading that will effect the panels.No windows in the roof.Looking for a 4KW Solar system and battery.Install within 1(...)

05 Dec

Cheltenham (GL52)

New Solar PV Installation

Roof facing: 15 degrees South. Pitched and tiled. No shading. 2 windows. Open to advice on system size. Interested in discussing a battery installation.(...)

04 Oct

Cheltenham (GL53)

New Solar PV Installation

**Plans available** Roof facing; Multi angle roof. Pitched and tiled. No shading. No windows. 1/2 sky lights. Open to advice on system size. Not looking for a(...)

21 Aug

Gloucester (GL2)

New Solar PV Installation

Roof: Unsure. Pitched and tiled. No windows. No shading. Open to advice on system size and battery. Install within 1 month and contact anytime.

02 Aug

Cheltenham (GL54)

New Solar Thermal Installation

Roof: East and west. Pitched and slated. No windows. No shading. Open to advice on system size. Install within 3 months and contact anytime.

11 Jul

Cheltenham (GL53)

New Solar PV Installation

Roof direction: South. Pitched & tiled. No shading. No windows. Open to suggestions regarding system size and battery. Install: within 1 month. Contact:(...)

09 Jul

Stroud (GL5)

New Solar PV Installation

Roof direction: Various. Pitched and tiled. No shading. 2 x Dorma windows. Open to suggestions regarding system size and battery. Install: within 1 year.(...)

01 May

Cirencester (GL7)

New Solar PV Installation

Roof: South. Pitched and tiled. 1 Dorma window. No shading. Open to advice on system size and battery. Install within 3 months and contact anytime.

15 Jan

Gloucester (GL3)

New Solar PV Installation

Roof: All directions. Pitched and tiled. May be some slight shading. No windows. Open to advice on the size of the system needed. Would like to discuss a(...)

12 Nov

Gloucester (GL19)

New Solar PV Installation

Roof: South. Pitched and tiled. No windows. No shading. Open to advice on system size and battery. Install within 3 months and contact anytime.

06 Sep

Cirencester (GL7)

New Solar PV Installation

**Requires Tesla Powerwall** Solar PV. South facing roof, pitched and tiled. No shading and no windows. Size system - open to advise. Would like a battery with(...)

13 Aug

Cheltenham (GL51)

Repair/Maintenance of Solar PV System

Damaged panel that needs to be replaced. It was installed 8 years. Repair: asap Contact. evenings and weekends

04 Jul

Tewkesbury (GL20)

New Solar PV Installation

Roof: South facing. Pitched and tiled. No shading. No windows on roof. Approx 10 panels. Install within 3 month. Contact anytime after 5th July 2018.

28 Jun

Ruardean (GL17)

New Solar PV Installation

Solar PV. South, west facing roof, pitched and tiled. No shading and no windows. Size system - open to advice. Work timescale within 3 months. Contact in the(...)

15 May

Drybrook (GL17)

New Solar PV Installation

Roof: Unsure. Pitched and tiled. No shading. No windows on roof. Open to advice of number of panels. Install within 6 months. Contact anytime

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue

Great service,helpful advisor and very quick response to online enquiry.

Jan

quote bottom

Fast response and produced three local installers to provide competetive quotes. Makes finding potential reliable contractors so easy.

TonyP

quote bottom

Many thanks for helping to secure the refund of my depoosit from Halo Renewables who retained it for two weeks following the cancellation of my order in the cooling off period.

Bob Owen

quote bottom

What would you like to do now?

split shadow blue
Get Free Quotes Read More Reviews